Infrastructure & City Development

Hindon Elevated Road – New Ramps + Cloverleaf Interchange (₹200 crore plan)

What is being planned

GDA has proposed building two new ramps and a cloverleaf interchange on the Hindon Elevated Road to significantly improve traffic flow and connectivity for residents in Indirapuram, Vasundhara, Siddharth Vihar and surrounding areas.

Why it’s important

  • Current access is limited: Presently, Vasundhara and Kanawani have only one-way ramps or restricted access — meaning vehicles can’t directly enter/exit the elevated road toward UP Gate (Delhi-Ghaziabad border).
  • Connectivity improvement: The new infrastructure will allow two-way access — making it easier for residents to reach major city points and the UP Gate without long detours on surface roads.
  • Traffic decongestion: The cloverleaf interchange planned near the Kanawani culvert will help traffic merge more smoothly, reducing congestion in densely populated neighbourhoods.

Project components

  • Two ramps (about 400 m long each) to provide entry/exit from both Indirapuram and Vasundhara.
  • A cloverleaf interchange to streamline movements and reduce conflict points between vehicles.
  • A Detailed Project Report (DPR) is being prepared; tenders and construction could begin within ~6 months of DPR completion.

Funding request

  • GDA has formally requested ₹200 crore from the Uttar Pradesh government for this project.

About Hindon Elevated Road

  • The 10.3 km elevated road was commissioned in 2018 and reduced travel time across the city drastically, linking Raj Nagar Extension with UP Gate (Delhi).

🏙️ 2) Handover of Colonies & Roads to Ghaziabad Municipal Corporation (₹66 crore)

What happened

GDA has transferred responsibility for several key residential colonies and roads in Ghaziabad to the Ghaziabad Municipal Corporation for improved civic services and infrastructure development.

Funding details

  • A total of ₹66 crore (≈ ₹66.32 crore) has been allocated to the Municipal Corporation as financial assistance for development and maintenance in these areas.
  • Of this, ₹33 crore has already been released as the first installment.

Purpose of the transfer

GDA’s move aims to improve:

  • Civic amenities (water supply, streetlights, sanitation)
  • Road maintenance and repair
  • Waste management
  • Sewerage and drainage systems
  • General upkeep in residential zones

What residents can expect

With the Municipal Corporation taking over, local residents in the affected colonies should see:

  • Faster response to complaints
  • More systematic infrastructural upkeep
  • Better integration of city services

GDA has also handed over all related documents and maintenance records to the corporation to ensure continuity in services.

Leave a Comment

Your email address will not be published. Required fields are marked *

Ghaziabad is a fast-growing NCR city that blends excellent connectivity and modern infrastructure with rich culture

Quick Links

Connect with Us

Ghaziabad, Uttar Pradesh – 201001
India.
8897965113
9398441197
info@ghaziabad.com

Copyright © 2026 Ghaziabad| Powered By Splenden

Scroll to Top